Case Study – Shipping Container Installation Across Gas Plant Sites

The Challenge

The client required the installation of 13 shipping containers across two operational gas plant sites. The locations demanded vacuum excavation for safety, strict compliance with site protocols, and precise placement. Working within a live gas facility added layers of complexity, requiring careful planning, engineered designs, and staged operations to maintain safety and site integrity.

Our Solution

We collaborated closely with the client and third-party engineers to develop a safe, engineered approach. Our team managed the entire site preparation, contracting concreting crews for footing installation and vacuum excavation teams to ensure asset protection. We fabricated steel stumps, designed and installed access platforms, and contracted cranes to lift and position all containers. Every stage was coordinated to align with gas site safety requirements and project sequencing.

The Outcome

The project was completed safely, efficiently, and to specification. All 13 shipping containers were installed across the two sites without incident. By managing the fabrication, third-party contractors, and installation logistics, we ensured minimal disruption to site operations and delivered a compliant, high-standard outcome.